Georgia Tech Disability Services: Finalized relationship to enhance our capacities in providing alternative media/text books, assistive technology, braille services, and technical support to our students with disabilities.
Digital Signage: Possible start date – Summer 2013
Office 365: Pilot Groups to begin using product week of March 11.
Microsoft Lync Collaboration Platform: In planning stage
Mobile Computing: Finalizing contract with CampusEAI for mobile apps and portal channels
Luminus Portal Replacement: Completed
Website Conversion to WordPress: Completed
IT Infrastructure Upgrades
Internet/SIP (New): Negotiations to begin with Windstream on March 12 to restructure campus PRI connection to SIP with vendor provided voice gateways and restructured long-distance service.
Voice over IP: 570 out of 824 Cisco handsets deployed.
Backup Systems Upgrade: 30% Completed. New data domain is in use with all servers transferred to the new backup process by early April.
Virtualization Systems Upgrade and Redundancy: 95% Completed. VMware is fully functional on new hosts with three servers left to migrate.
Operational Storage Replication Upgrades: 75% of servers converted to new operational storage.
Upgrade Core (New): Purchase new core switches and move existing core routers to support replication between Telecom Facility and Computer Center
Bandwidth Upgrade to 300 MB: Postponed due to tighter P2P blocking that freed existing bandwidth
Banner Middle Tier Upgrade: Installed with remaining users to be transitioned by early April
Bradford Access Control (Wireless and Wired): Initial Installation completed to provide endpoint compliance, guest networking, and BYOD.