Berea College is building on the success of the Matilda Hamilton Fee Hydroelectric Station at Lock 12 on the Kentucky River by partnering with Appalachian Hydro Associates to build a second hydropower plant 35 miles upstream at Lock and Dam 14 near Heidelberg in Lee County.
In 2021, Berea College became the first higher education institution in the nation to complete construction of a hydroelectric generating plant, located on the Kentucky River near Ravenna. Continue reading Berea College Constructing Second Hydroelectric Generating Plant at Lock 14 in Beattyville →