Berea College Constructing Second Hydroelectric Generating Plant at Lock 14 in Beattyville

Lock 14 site

Berea College is building on the success of the Matilda Hamilton Fee Hydroelectric Station at Lock 12 on the Kentucky River by partnering with Appalachian Hydro Associates to build a second hydropower plant 35 miles upstream at Lock and Dam 14 near Heidelberg in Lee County. (Photo courtesy of Berea College)

Berea College is building on the success of the Matilda Hamilton Fee Hydroelectric Station at Lock 12 on the Kentucky River by partnering with Appalachian Hydro Associates to build a second hydropower plant 35 miles upstream at Lock and Dam 14 near Heidelberg in Lee County.

In 2021, Berea College became the first higher education institution in the nation to complete construction of a hydroelectric generating plant, located on the Kentucky River near Ravenna. Continue reading Berea College Constructing Second Hydroelectric Generating Plant at Lock 14 in Beattyville

Berea College First Higher Education Institution to Bring Hydroelectric Power to Region

RAVENNA, Ky. – Berea College is the first higher education institution in the nation to complete construction of a hydroelectric generating plant, located at Lock and Dam 12 on the Kentucky River near Ravenna, Ky. The small-scale demonstration project produces on average about half of the electricity the College uses on an annual basis, further reducing the school’s carbon footprint.

“The hydroelectric generating plant shows that local green initiatives like this one can be financially feasible and create reliable sources of income and acceptable rates of return on investment,” said Berea College President Lyle Roelofs. “At the same time, it displays to our students and everyone else both the College’s commitment to environmental sustainability and the viability of state-of-the-art renewable energy technologies.”

Continue reading Berea College First Higher Education Institution to Bring Hydroelectric Power to Region